Thursday, May 26, 2011

ASTM ribbon window testing in Orlando, FL

BDG was recently in Orlando at a new medical facility performing quality assurance testing on a newly installing ribbon window system. The windows were tested utilizing the ASTM E1105 standard as a part of a quality assurance program specified by the owner. In addition to BDG performing this third party testing, the contractor is performing their own in-house hose nozzle testing. We don't see that too often! This is the second phase of testing. With the exception of a few minor issues, the ribbon window system has passed all of the testing. We will be back in early June to perform the final phase of testing.



RS

- Posted by BDG using BlogPress